I need to remove my bow pulpit and re-bed it. Will use "Maine Sail's" method for rebedding deck hardware. Used his method previously to re-bed my genoa tracks and it is an awesome and leak proof process. However, for my bow pulpit the aft base for the bow pulpit has 3 thru deck bolts two of which I can get to very easily but the outboard bolts on both the port and starboard bases are impossible to get to. The nuts for these bolts are between the anchor locker (which is molded into the deck) and the deck to hull seam. Aside from the numerous (and sharp!) deck to hull fasteners there is simply no room to access the nuts. Any suggestions or will I have to install small access hatches on either side of the anchor locker to get to these nuts and properly repair the deck and reinstall the bow pulpit. Photo below should help explain.
Attachments
-
75.5 KB Views: 177