I picked up a nice table last week for the Luger. It should fit perfectly and can be used as a drop down for an extra double berth. I came out of a Catalina 27 and has a chart map of the southern California waters. These are the before pictures I'll post the after picts in about a week after varnishing.
I also picked up the stern rail from the same C-27 and it fits the Luger perfectly. I bought it to replace the ugly 3/4" aluminum rail they installed. Now all I need is the bow pulpit. I also grabbed all of the electronics including several amp/voltage meters, switches and a couple of main switches bus bars etc. I also pulled out what looked to be a brand new gusher pump. The hose is in and out is about 1 3/4". I also removed the battery charger which was also metered. I'll be going back to pick up the stanchions is a couple of weeks.
I also picked up the stern rail from the same C-27 and it fits the Luger perfectly. I bought it to replace the ugly 3/4" aluminum rail they installed. Now all I need is the bow pulpit. I also grabbed all of the electronics including several amp/voltage meters, switches and a couple of main switches bus bars etc. I also pulled out what looked to be a brand new gusher pump. The hose is in and out is about 1 3/4". I also removed the battery charger which was also metered. I'll be going back to pick up the stanchions is a couple of weeks.
Last edited: