So stepping and rigging went well launching was a breeze. But there was one thing I could not check in all the refitting. The damn sr Mariner thru hulls. I elected to not to cut them out as I did not want a major glass project on top of all the other work. (Plus cutting out plastic sealed with 5200 did not appeal. So had my wife pull the cushion and check them the very first thing. Yep already had about a gallon of water. In goes the trailer. Out comes the boat I pull aside to see if I can reseat the gasket, give it a second launch, no go. So have lunch in the parking lot, break down the boat and wait for the blanks from Sr Mariner to com in.
Positives rigging went smoothly, breakdown also went well. And didn't discover water in the boat 1 mile from the ramp. wife joked we did all the hard parts so next time Neptune will be kind. (She forgot the "offering" for the renamed boat.) So we we're lucky Neptune didn't smite us harder.........
Positives rigging went smoothly, breakdown also went well. And didn't discover water in the boat 1 mile from the ramp. wife joked we did all the hard parts so next time Neptune will be kind. (She forgot the "offering" for the renamed boat.) So we we're lucky Neptune didn't smite us harder.........