We are going to replace the backstay tomorrow (finally).
Plan is to use the main halyard for the bosun's chair and a second for a safety line. The third halyard will be run to the toe rail aft as a temporary backstay. Likewise, when the climber hits the spreaders we will rig a heavy line from above the spreaders aft as a temporary backstay. I also have an 1/8 in fixed wire topping lift going to the boom and can hardend the boom vang and mainsheet (aft traveler) as a third source of "stay."
Plan is to go to the top with a messenger line for pulling up tools, etc...use it to pass the new halyard up then perform a quick swap up top and come down. The boat will be on her mooring and conditions are supposed to be mild tomorrow.
Any last minute tips?
thanks,
Bob
Plan is to use the main halyard for the bosun's chair and a second for a safety line. The third halyard will be run to the toe rail aft as a temporary backstay. Likewise, when the climber hits the spreaders we will rig a heavy line from above the spreaders aft as a temporary backstay. I also have an 1/8 in fixed wire topping lift going to the boom and can hardend the boom vang and mainsheet (aft traveler) as a third source of "stay."
Plan is to go to the top with a messenger line for pulling up tools, etc...use it to pass the new halyard up then perform a quick swap up top and come down. The boat will be on her mooring and conditions are supposed to be mild tomorrow.
Any last minute tips?
thanks,
Bob