I am in the process of installing Air Conditioning to our boat. Have the spot chosen narrowed down as the best of worst case senerios. Venting the salon and the V berth no problem, but adding air to the rear cabin means, I have multiple holes to drill through 3 bulkheads and 4 cabinets for a straight run. All doable with the hole saw and drill.....after moving a fuel line, water line, a propane line and 2 wirering harnesses I think Ive got a clear shot. My only hesitation right now is the decision of drilling a 4" hole 6" to the right of the port chainplate or 6" below the port chain plate. Loads in question lends me to the 6" to the right of the chainplate.......What are the groups thoughts?.....and afterwards anyone recomend backing plates around the new hole to distribute the loads?ThanksRob