Well the long project is finally over. The windlass is in, complete with anchor wash down and best of all it works. I cut the anchor door into two pieces (1/3 -2/3). Glassed the front piece in and mounted the Maxwell 800 on the front piece. Mounted a separate battery up front for the windlass and installed a wash down system in the anchor locker as well. I have a Bruce with 100’ of 5/16 HT chain and 150’ of 5/8 rode and it all fits neatly in the locker without any additional cutting of the locker. I do have pictures and will send them out to anyone that requests them. I also would be happy to discuss the project with anybody by phone, just e-mail me.Vinny