On these B&R rigs it is referred to as prebend. If you search on that you will see quite a bit of discussion. Your rig needs 1% bend over the length of the mast. For a 50 foot mast that would be .5 feet or 6 inches at the middle confirmed by pulling a string from top to bottom and measuring the deflection in the middle. The diamond stays are what sets the prebend and is usually done with the mast down.