Installing new standing rigging while mast is down. Owners manual requires 65' total up and down. Assume I'll need to add footage while bringing line back to cockpit with managed little to store when sail is up.
What is the best way to feed a 3/8" line through the mast when it is up or down? One would think either way that there needs a sewn mending of the old to the new and just pulled through, correct. Otherwise how do you push a wet or dry rope down the mast when starting at the mast head while the mast is down.? Mast is currently down............................
What is the best way to feed a 3/8" line through the mast when it is up or down? One would think either way that there needs a sewn mending of the old to the new and just pulled through, correct. Otherwise how do you push a wet or dry rope down the mast when starting at the mast head while the mast is down.? Mast is currently down............................