The temporary Battery Meter set up, in the future location of the AC/DC electrical box.
M

The temporary Battery Meter set up, in the future location of the AC/DC electrical box.

There are no comments to display.

Media information

Album
Electrical System Upgrade-Phase 1
Added by
mdmitch
Date added
View count
184
Comment count
0
Rating
0.00 star(s) 0 ratings

Image metadata

Filename
8808-1275344659-eb1524158d733badeb6ecb98fa165dfb.jpg
File size
18.1 KB
Dimensions
600px x 450px

Share this media