Remember this is phase 1. I minimized the battery connections and added components for battery voltage and current monitoring. This is largely "temporary" as the next phase will move the AC and DC distribution panels to a new location. That big thing to the left of the buss bar unit is a shunt to measure the current in and out of the battery. The connection from the shunt goes to a Blue Sea Systems digital multimeter that will alarm for high and low voltage limits. The meter displays battery voltage and +/-amperage. (discharging or charging)
M

Remember this is phase 1. I minimized the battery connections and added components for battery voltage and current monitoring. This is largely "temporary" as the next phase will move the AC and DC distribution panels to a new location. That big thing to the left of the buss bar unit is a shunt to measure the current in and out of the battery. The connection from the shunt goes to a Blue Sea Systems digital multimeter that will alarm for high and low voltage limits. The meter displays battery voltage and +/-amperage. (discharging or charging)

There are no comments to display.

Media information

Album
Electrical System Upgrade-Phase 1
Added by
mdmitch
Date added
View count
208
Comment count
0
Rating
0.00 star(s) 0 ratings

Image metadata

Filename
8806-1275331127-90dd624aea0ca1ebffd64b05ecbd257c.jpg
File size
47.8 KB
Dimensions
600px x 450px

Share this media