Hi,
We're up in Rochester, NY, sailing on Lake Ontario, and have a new to us O'day 25 that had been abandoned in the yard and not in the water for 5 years. After a very hard bottom paint project we are in the water and sailing. The main halyard was a wire and rope splice, and the wire was shot, very crinkley, and we couldn't get the main all the way up.
We decided to replace the main halyard, with all rope 5/16" Stay-set X from West Marine, spliced it on to the wire temporarily and tried to pull it through. It won't go through, so I'm wondering why? I thought we could run a rope only halyard no problem, but perhaps I'm wrong. We need to go up the mast to check this out, I think, but then our problem is we only have the jib halyard to work with, which is also a wire splice, and I've read to avoid using a bosun's chair on a wire splice halyard.
Anyone have any ideas? Do we have to run a wire-rope halyard on the O'day 25? At this point it appears that we aren't able to pull anything through beyond a certain size. We couldn't get the old halyard to pull through on either end, whether the wire-rope splice side, or the metal eye side, so how would we get a new wire halyard on anyway? Seems like it would have to be spliced on the boat?? Something doesn't seem right, so any help would be appreciated.
Thanks!
Wes
Thanks
We're up in Rochester, NY, sailing on Lake Ontario, and have a new to us O'day 25 that had been abandoned in the yard and not in the water for 5 years. After a very hard bottom paint project we are in the water and sailing. The main halyard was a wire and rope splice, and the wire was shot, very crinkley, and we couldn't get the main all the way up.
We decided to replace the main halyard, with all rope 5/16" Stay-set X from West Marine, spliced it on to the wire temporarily and tried to pull it through. It won't go through, so I'm wondering why? I thought we could run a rope only halyard no problem, but perhaps I'm wrong. We need to go up the mast to check this out, I think, but then our problem is we only have the jib halyard to work with, which is also a wire splice, and I've read to avoid using a bosun's chair on a wire splice halyard.
Anyone have any ideas? Do we have to run a wire-rope halyard on the O'day 25? At this point it appears that we aren't able to pull anything through beyond a certain size. We couldn't get the old halyard to pull through on either end, whether the wire-rope splice side, or the metal eye side, so how would we get a new wire halyard on anyway? Seems like it would have to be spliced on the boat?? Something doesn't seem right, so any help would be appreciated.
Thanks!
Wes
Thanks