Deck organizer on hunter 340

HD74

.
Dec 27, 2016
64
Hunter 340 Pickwick tn
The boat is a 1999 hunter 340. I would like to run more lines back to my cockpit however I only have three sheaves per side on my deck organizers. Has anyone dealt with this thanks
 
Feb 21, 2013
4,638
Hunter 46 Point Richmond, CA
My 3 sheave deck organizers serve all the running rigging I need to run to the cockpit. My topping lift ties off onto a cleat on the mast and have not had a need to bring it the cockpit. You can install a 4 sheave deck organizer like the one below if there is room.

1603325852187.png
 
Nov 21, 2007
673
Beneteau Oceanis 34 Kingston, WA
My 3 sheave deck organizers serve all the running rigging I need to run to the cockpit. My topping lift ties off onto a cleat on the mast and have not had a need to bring it the cockpit. You can install a 4 sheave deck organizer like the one below if there is room.

View attachment 186393
If that is the organizer that you have, or if the spacing works, those can be double stacked as well. There are several different sizes and configurations available.
Oranizer - 12.jpeg Port side - 1.jpeg
 
Last edited:
  • Like
Likes: sail sfbay
Dec 14, 2003
1,438
Hunter 34 Lake of Two Mountains, QC, Can
On my 34 I have installed 2 Schaeffer deck organizers: one with 6 sheaves on starboard side (5 are used) and one with 4 sheaves on port side (all 4 used). If attachments point don't work for you, just plug them up and drill and tap new ones. There is an aluminum backplate for that under the fibreglass. Has worked well for me for years. Good luck
 

Attachments

Jun 8, 2020
78
Hunter 34 White St Helens, OR
On my 34 I have installed 2 Schaeffer deck organizers: one with 6 sheaves on starboard side (5 are used) and one with 4 sheaves on port side (all 4 used). If attachments point don't work for you, just plug them up and drill and tap new ones. There is an aluminum backplate for that under the fibreglass. Has worked well for me for years. Good luck
can folks share the arrangement and organizing schemes for their lines and deck organizers? My 1984 Hunter 34 had a hard life before I got it and a lot of the running rigging had been cut away or lost. Thanks in advance.
 
Jan 22, 2008
8,050
Beneteau 323 Annapolis MD
can folks share the arrangement and organizing schemes for their lines and deck organizers? My 1984 Hunter 34 had a hard life before I got it and a lot of the running rigging had been cut away or lost. Thanks in advance.
You should start your own thread to post your question.
 
  • Like
Likes: SoSound

HD74

.
Dec 27, 2016
64
Hunter 340 Pickwick tn
On my 34 I have installed 2 Schaeffer deck organizers: one with 6 sheaves on starboard side (5 are used) and one with 4 sheaves on port side (all 4 used). If attachments point don't work for you, just plug them up and drill and tap new ones. There is an aluminum backplate for that under the fibreglass. Has worked well for me for years. Good luck
Thanks so much for your help exactly what I needed
 

HD74

.
Dec 27, 2016
64
Hunter 340 Pickwick tn
If that is the organizer that you have, or if the spacing works, those can be double stacked as well. There are several different sizes and configurations available.
View attachment 186402 View attachment 186403
My 3 sheave deck organizers serve all the running rigging I need to run to the cockpit. My topping lift ties off onto a cleat on the mast and have not had a need to bring it the cockpit. You can install a 4 sheave deck organizer like the one below if there is room.

View attachment 186393
Thanks for your help