I applied my second to last coat of 2000e (white) before I start on the AF paint. I am kind of concerned about the speed the 2000e is drying. The last coat needs to pass the thumbprint test so to "hot coat" the first coat of AF. It was 65 and overcast this morning and the 2000e was already well pass the thumbprint test after just 25 minutes....no where near the time stated on the can. Anyone else experienced this too? I reck'n I need to roll 2000e in my right hand and AF in my left 