Just heard from the machine shop, the strut has been straightened and is ready for a test fit, we have a new cutlass bearing at the ready and I figure we'll do the test fit after Thanksgiving. I cleaned the prop now the shaft is next.
PS. On my h-27. I removed the handrails and replaced with stainless pipes. Two 10 foot 1" pipes did the trick. I put the curve in the pipe to follow the cabin top as I installed it. Came out great. Will probably do the same modification on my h-30 in a few years.
This site uses cookies to help personalise content, tailor your experience and to keep you logged in if you register.
By continuing to use this site, you are consenting to our use of cookies.