I am planning on replacing the running rigging of my 1977 H25. I could use some advice on proper line size/length. I also plan to replace the old wire halyards.My assumption is that I need the following:50'x2 for the 110% jib - 5/16" LS Braid75'x2 for the 155% Genoa - 5/16" LS Braid??' for the main sheet - 5/16" LS Braid45'(?) for the main halyard - 5/16" XLS Braid??' for the jib Halyard - 5/16" XLS BraidI could also use some advice on the proper lengths for all of the above. And I will need an eye splice for both halyards - right?Beside Samson are there other good companies I should consider?Thanks!!