Just bought a '91 Hunter 23. Previous owner had, I think, modified the topping lift by attaching a wire rope to the aft pin on the mast crane, the one behind the main sheet sheave. The length of this line is fixed, by using cable clamps, and attached to end of boom with shackle. From prior experience on other boats, mainly charters, seems to me the topping lift should normally be adjustable.
I do have the manual from Hunter, but it does not show any info on running rigging (odd, to me).
Does anyone have any info, ideally photos, on the correct way to rig this? Does the topping lift line pass through end of boom and then out an exit at fore end of boom? What size line is appropriate?
Thanks!
I do have the manual from Hunter, but it does not show any info on running rigging (odd, to me).
Does anyone have any info, ideally photos, on the correct way to rig this? Does the topping lift line pass through end of boom and then out an exit at fore end of boom? What size line is appropriate?
Thanks!