My headstay needed to be replaced, so I am taking this off-season opportunity to pull the mast and take care of some things:
Sheaves: The jib halyard WAS still wire to rope. It was this, that tangled with the headstay, so I will replace with all rope. The PO replaced sheave pins with bolts, NOT a good thing. So new sheave pins, and new sheaves. These are 2", 33/64 wide (13mm) for a 1.4" pin. I was looking through several sources, and would like an upgraded ball bearing sheave if I can find it. Anyone replaced theirs?
Anchor Light: the masthead has a cast in surface for a flush mount light. I contacted Hella directly for mounting patterns, three #6-32 bolts are in 1.95" (close enough to 2") diameter mounting pattern? 2-1/2" base diameter. Wire throughway is 3/4". Mainesail: thanks for your recommendations on your site for dedicated fixtures. I am trying to find a source that is a direct fitment. Any other recommendations on manufacturers? I am looking for colreg approved
Spinnaker Crane: A bolt on addition, a slightly longer loop would be preferred to keep the block ahead of the headstay. What are sources for this? I haven't started looking for that yet, still lost looking for an aftermarket sheave.
Internal Halyards: There are four sheaves with a nice divider cast in. three were used the fourth empty. I presume it was originally external halyards and provided a main and jib only. Now I have opportunity for four internal... what have others used for layout?
Standing Rigging: local or Rudy for sourcing? I plan to inspect and replace only what is required, saving boat bucks for the other upgrades.
Mast Exit Plates: There are none, just grooves cut into the mast. The wire has already eroded some of the mast. I am looking for recommendations from those that have installed the same. Rollers, plain stamped stainless, what say ye?
I will need to figure out posting pictures....that should garner more interest.
Sheaves: The jib halyard WAS still wire to rope. It was this, that tangled with the headstay, so I will replace with all rope. The PO replaced sheave pins with bolts, NOT a good thing. So new sheave pins, and new sheaves. These are 2", 33/64 wide (13mm) for a 1.4" pin. I was looking through several sources, and would like an upgraded ball bearing sheave if I can find it. Anyone replaced theirs?
Anchor Light: the masthead has a cast in surface for a flush mount light. I contacted Hella directly for mounting patterns, three #6-32 bolts are in 1.95" (close enough to 2") diameter mounting pattern? 2-1/2" base diameter. Wire throughway is 3/4". Mainesail: thanks for your recommendations on your site for dedicated fixtures. I am trying to find a source that is a direct fitment. Any other recommendations on manufacturers? I am looking for colreg approved
Spinnaker Crane: A bolt on addition, a slightly longer loop would be preferred to keep the block ahead of the headstay. What are sources for this? I haven't started looking for that yet, still lost looking for an aftermarket sheave.
Internal Halyards: There are four sheaves with a nice divider cast in. three were used the fourth empty. I presume it was originally external halyards and provided a main and jib only. Now I have opportunity for four internal... what have others used for layout?
Standing Rigging: local or Rudy for sourcing? I plan to inspect and replace only what is required, saving boat bucks for the other upgrades.
Mast Exit Plates: There are none, just grooves cut into the mast. The wire has already eroded some of the mast. I am looking for recommendations from those that have installed the same. Rollers, plain stamped stainless, what say ye?
I will need to figure out posting pictures....that should garner more interest.