H260 Furling
The cost of a new mast, boom and mainsail was about three thousand. But, It took me six months of engineering:-Finding what would fit the existing standing rig-Design and test a new mast raising system because the gin-pole mast hole interferes with the furling drum and the mast is too heavy to lift by hand or by mainsheet.-Modifying and enhancing the furling mast to work properly.-Designing a solid vang to handle furling line, eliminating the toping lift.But, it was worth the 9 month effort.-Nils Anderson