No Sheave Req'd
If you have a wire topping lift, then no sheave is req'd t the top of the mast. Since the line should have a loop and thimble at the top, only a small shackle is req'd to attach it to the masthead. The lower loop and thimble should have a small 1/4" block to receive a topping lift adjustment line . The line will then shackle to the end of the boom, also, go up and thru the block and back down to a cleat on the end/side of the boom to tighten or loosen the topping lift adjustment to level the boom when the main is raised.