After several years of wishing and wanting. Java has gotten an upgrade. We now have Solar Stik installed on the boat. Brian and his team did an install in less than three days. Most of the time was spent creating a mounting bracket to the rails which is rock solid. The boat is still in St Augustine while I'm in Virginia. We will be bringing the boat back home in May. At that time I'll have more pictures of the install. Just after installing the solar panels I checked the amount of power I was getting and was just at 8 amps. I'm now free of the dock power cord to keep the batteries topped up.
Attachments
-
44.8 KB Views: 225