G
Guest
I removed the CB on my 95 H26 today to repair the leading edge and replace the uphaul line. I found the plastic bushing for the pivet pin worn and the epoxy around the bushing gone, out to about 3/4" from the bushing edge. I plan to glass onto the leading edge and around the bottom curve some new cloth sweeping back from the edge about 2 inches. Should I replace the center bushing or glass matt around the original? Also if I replace the bushing what would be the best material to use? PVC, poly, tygone etc? Could a stainless bushing be used as I have the ability to fab one up? Thanks.RayS/V SpeedyPS. I dropped the CB by suspending the boat bunks about 4 feet up and dropped the trailer frame to the ground. Took about 4 hours and the installation should take about the same. If you need to do the same then E-mail for procedure.