J
John
The prior owner of my C27 replaced the original holding tank with a stainless steel holding tank fabricated by a local shop. It is difficult to determine when it is time to pump out. Is stainless steel appropriate for this application? Should I replace? If so, with what? What is the most reasonable method of monitoring tank level? Lastly, should my tank vent line have a "dip" or trap in it where waste can collect? It seems to me that the vent line should have a continous fall from the vent fitting at the stern down to the tank.