Gee, a new look for Yahoo! I have just added a new chapter to our
Vega
1639 rebuild site. It is the building of a new head and holding tank.
Check it out at
Tarka the Otter
or go to the links page of this Yahoo group.
It allows for marina and manual pump out (where permitted).
I am starting to see the end of the tunnel of this rebuild. I have
some plumbing to do, engine work, and then all the fabric work
(upholstery and sun protection). The compressor and cold plate needs
installation. (I am waiting for the thermostat and instructions).
Then
we will bed all the fittings back to the deck. A never ending
list.....
Alan & Felicity
Vega 1639 "Voila" formerly "Tarka the Otter"
Vega
1639 rebuild site. It is the building of a new head and holding tank.
Check it out at
Tarka the Otter
or go to the links page of this Yahoo group.
It allows for marina and manual pump out (where permitted).
I am starting to see the end of the tunnel of this rebuild. I have
some plumbing to do, engine work, and then all the fabric work
(upholstery and sun protection). The compressor and cold plate needs
installation. (I am waiting for the thermostat and instructions).
Then
we will bed all the fittings back to the deck. A never ending
list.....
Alan & Felicity
Vega 1639 "Voila" formerly "Tarka the Otter"