I had Atlantic replace the forward stay and install a roller furling rig last fall. The rigger was excellent but his helper was lost. The helper went up the mast and got the leed line they were using to run a new hallyard inside the mast caught in the sheaves at the top of the mast, his answer was cut it off an leave the rest inside hanging down inside the mast. The rigger went up and fixed it. Final product was excellent, just made me worried to leave.