Adding a second house bank to my O361. In doing so I will be adding another OEM battery switch. I would like to use the load side of the switches and parallel switch as the DC + distribution point. I was thinking of having a brass plate made at a machine shop then mounting it across the nuts of the three switches across the load side. When I was in the Navy, I saw similar configurations in aircraft. The alternative is to use 2 1/0 AWG wire to make the connections between each battery switch and parallel switch. Operationally it would allow either house bank to energize the bus, or turn on the parallel switch to use the starter bank to energize the bus.
My question is this counter to any ABYC standards?
TIA for answering.
-bgs-
My question is this counter to any ABYC standards?
TIA for answering.
-bgs-