Pulling the perkins: rear main seal, all new hoses and better type hose clamps, plumb in a rapid oil change fitting (flip a switch and the hot oil gets sucked out of the bottom of the engine), new oil pan gasket, pull the heat exchnager and clean, new motor isolators, re wire harnesses, rebuild starter, referb velvet drive, install new shaft and pyi dipless packing gland......wow what a 2 month project.  this is my buddy that helps gotta love thos guys
aduffE37

Pulling the perkins: rear main seal, all new hoses and better type hose clamps, plumb in a rapid oil change fitting (flip a switch and the hot oil gets sucked out of the bottom of the engine), new oil pan gasket, pull the heat exchnager and clean, new motor isolators, re wire harnesses, rebuild starter, referb velvet drive, install new shaft and pyi dipless packing gland......wow what a 2 month project. this is my buddy that helps gotta love thos guys

There are no comments to display.

Media information

Album
Fishermans Boatyard 2009
Added by
aduffE37
Date added
View count
233
Comment count
0
Rating
0.00 star(s) 0 ratings

Image metadata

Filename
10974-1293567712-ed58bf39a07b70f9393ac4f929def9b3.jpg
File size
38.7 KB
Dimensions
450px x 600px

Share this media