3. Cleanup and painting raised engine beds. I replaced all the bilge hoses and put in an additional electric bilge pump. Added plywood to the wall next to sink to seal up some openings and improve soundproofing. Beds needed to be raised a bit over 2" to accommodate new engine. Spacing between beds was fine. Glasswork was about $350.
scottmcg

3. Cleanup and painting raised engine beds. I replaced all the bilge hoses and put in an additional electric bilge pump. Added plywood to the wall next to sink to seal up some openings and improve soundproofing. Beds needed to be raised a bit over 2" to accommodate new engine. Spacing between beds was fine. Glasswork was about $350.

There are no comments to display.

Media information

Album
S2 9.2a gets a new Beta 25 (summer 2011)
Added by
scottmcg
Date added
View count
266
Comment count
0
Rating
0.00 star(s) 0 ratings

Image metadata

Device
NIKON COOLPIX S6000
Aperture
ƒ/4.6
Focal length
8.1 mm
Exposure time
1/30
ISO
200
Flash
On, fired
Filename
14791-1328688038-cd055a8f8212dee8200bcbec78b217ad.jpg
File size
53.2 KB
Date taken
Tue, 05 July 2011 8:15 PM
Dimensions
360px x 480px

Share this media