000 0217 Work in progress. Pin bores were built up and faired with thickened epoxy.
Dennis Kitchen

000 0217 Work in progress. Pin bores were built up and faired with thickened epoxy.

There are no comments to display.

Media information

Album
23.5 centerboard repairs
Added by
Dennis Kitchen
Date added
View count
429
Comment count
0
Rating
0.00 star(s) 0 ratings

Image metadata

Filename
2251-1228262649-b4fa5c12a954c0b7078bae210df79e64.jpg
File size
33.1 KB
Dimensions
600px x 450px

Share this media