Pulled the boat up to the house after work, killed about 20 wasps that were in one of the through hulls and the mast crutch, opened the DampRid, set up the PVC frame in the cockpit, and with the Admiral's help, put the tarp on. Probably should have replaced it but we'll see if it survives another winter. Once it was tied to the trailer we towed it back down to the lock up for the winter. :cry:
One week of sailing, glorious as it was, is NOT enough!
One week of sailing, glorious as it was, is NOT enough!