Next locker, the hanging locker forward of the head. Removed the pump and associated hoses, then sanded and cut a couple of cardboard templates for shelves. Thoughts?
After sanding I noticed a fiberglass repair that a previous owner made on the inside of the anchor locker bulkhead directly behind my dry rot repair. Either he covered up an issue or failed to completely fix the problem. I'll probably give the bulkhead a couple of overlapping layers of mat and cloth before installing shelves.
After sanding I noticed a fiberglass repair that a previous owner made on the inside of the anchor locker bulkhead directly behind my dry rot repair. Either he covered up an issue or failed to completely fix the problem. I'll probably give the bulkhead a couple of overlapping layers of mat and cloth before installing shelves.
Attachments
-
504.9 KB Views: 227
-
374.9 KB Views: 239