79 L25

Status
Not open for further replies.
Nov 26, 2007
155
Lancer 25 SoCal
Next locker, the hanging locker forward of the head. Removed the pump and associated hoses, then sanded and cut a couple of cardboard templates for shelves. Thoughts?

After sanding I noticed a fiberglass repair that a previous owner made on the inside of the anchor locker bulkhead directly behind my dry rot repair. Either he covered up an issue or failed to completely fix the problem. I'll probably give the bulkhead a couple of overlapping layers of mat and cloth before installing shelves.
 

Attachments

Status
Not open for further replies.