Came across this in my inbox today:
"1.The north (inbound) channel, directly under the SH146 bridge, will be completely closed beginning at 8:00am on Monday 4/15/19. This closure will be in place continuously for approximately one month. This closure will allow the contractor to remove the existing fender system so they can begin constructing new bridge foundations. The south (outbound channel) will not be obstructed by other work on the SH146 project while this closure is in place.
a.Please be advised that the south (outbound) channel will have two-way traffic during this time.
b.Message boards have been placed on both approaches to the channel to assist with notifying approaching vessels.
c.The closure will consist of two barges side-by-side within the channel as depicted below:"
I'm debating just taking down a lawn chair, some food and drinks, sitting down and just watching the commotion.
"1.The north (inbound) channel, directly under the SH146 bridge, will be completely closed beginning at 8:00am on Monday 4/15/19. This closure will be in place continuously for approximately one month. This closure will allow the contractor to remove the existing fender system so they can begin constructing new bridge foundations. The south (outbound channel) will not be obstructed by other work on the SH146 project while this closure is in place.
a.Please be advised that the south (outbound) channel will have two-way traffic during this time.
b.Message boards have been placed on both approaches to the channel to assist with notifying approaching vessels.
c.The closure will consist of two barges side-by-side within the channel as depicted below:"
I'm debating just taking down a lawn chair, some food and drinks, sitting down and just watching the commotion.
Attachments
-
850.2 KB Views: 118