All of the installations that I have seen have been on the front of the mast. If it is mounted on the arch it would have to be near the back in order to clear the boom. I am sure that it is doable with fittings and pipe but I have not seen any examples. It could be possible to mount it on a post flush mounted to the transom step, off to the side of the walk through, and supported off the arch. Good luck.