on my 41 the main furling line is an endless loop. Is that correct?
How do you call that join in english so i can do a serch on youtube how to do it.
You cannot see the joint on my line, and as been wrongly updated with a bigger size line so i does not run very well tru the pulleys, it will become stuck and jump of the winch that is below of the boom.
What tipe of line work better in this case?
How do you call that join in english so i can do a serch on youtube how to do it.
You cannot see the joint on my line, and as been wrongly updated with a bigger size line so i does not run very well tru the pulleys, it will become stuck and jump of the winch that is below of the boom.
What tipe of line work better in this case?