Being the second winter of owning a boat with deferred maintenance, I should have concentrated on the maintenance. But no, I had to throw in a few upgrade projects. Then a few more just for fun.
I could be in as early as next week and finish my list while on the water but a lot of the stuff I need to do is easier to do on the hard than bouncing on the water.
We may be in the water for Memorial Day but most likely the week after.
Completed: New DC Panel, new AC Panel, new custom DC outlet panel, new Smart Plug, new Balmar SG200 Battery Monitor, Converted Alt to ER and installed Balmar MC614 ER, new fuel lines, relocated fuel filter, 4 new thru hulls and valves, new Groco sea water strainer, new hot water tempering valve on WH, new speed and depth transducers, back plane for new SeaTalkng network components, scrape bottom, wire brush and paint prop and shaft.
In Process: Mount new instruments in pod, wire pedestal guard and reinstall, wire STng network, new GI, new fresh water fill hose and commission water system, repair steering gear hatch cover, install new outhaul, bottom paint.